| Description | Includes site plans, cross-sections and elevations: 
 Roof for shed, west side of Ouse Dock, 1 Feb 1881
 Warehouse west side, 16 Aug 1883
 'Victoria Lock' which includes Goole New Lock low gates, elevation of Low Pier south side of lock, 5 May 1887
 Timber Jetty Murham Lane, 28 Sep 1887
 Eastern Extension of Ouse Dock, 1888
 Eastern Extension of Ouse Dock, 2 Jun 1888
 Drawing showing suggestion for strengthening Victoria Pier, 1 Apr 1893
 Goole Docks New Calais Berth, 9 Mar 1903
 No 2 Graving Dock foundation for 7 ton Derrick crane, 1911
 Indent south west corner Ouse Dock, 28 Apr 1914
 New passageway, south of Lowther (Iron) Bridge connecting lines at north end of bridge, 14 Sep 1914
 
 Three plans together:
 Wharf and roadway south west corner Railway Dock, 24 Nov 1917
 Repair Dry Dock reconstruction, 5 Apr 1921
 No 3 Dry Dock, 27 Oct 1922
 Wharf on north east corner of ship dock plan, 27 Oct 1932
 
 Undated:
 Let off culvert No 3 Dry Dock, nd.
 Eastern extension of Ouse Dock, nd. [fragile]
 Lowther Bridge, nd. [fragile]
 Eastern extension, nd. [fragile]
 Proposed extension of Banks Terrace siding, nd.
 No 1 Dry Dock, nd.
 |