Description | Includes faculties and related correspondence: Faculty to dig five trial pits, 6 Dec 2004 Faculty to repoint masonry, take down and rebuild the nave gable cross, commission and install a new cross for the east gable, renew leadwork to vestry chimney back gutter, repairs to glazing and opening hoppers, lightening protection to the bellcote, drill bore holes in churchyard, temporary arrangements for surface water disposal and repair bell fittings, 9 Mar 2005 Faculty to renew and upgrade the complete electrical installation, 9 Mar 2005 Faculty to stabilise the structure by removing the floors and interior fittings, introducing a new reinforced concrete floor and underpinning the perimeter of the building, reintroducing floors, fittings and new plaster and paint finishes, repair stained glass of the east window, introduce external surface water drainage system around the entire church, introduce new water, gas and electricity connections across the churchyard, and carry out minor roof repairs, 6 Jun 2007 Amended faculty to install a pine tongue and groove timber floor in the nave to be overlaid with oak, reuse existing tiles in the chancel and sanctuary, 12 Mar 2008 Faculty to decorate the nave and chancel roofs, 7 Jul 2008 |