Description | Includes Environmental Statement documents: 6.1 Introduction 6.2 Scheme Description 6.3 Design Iterations and Alternatives Considered, Appendix 3.3 Crossing Options Report 6.4 EIA [Environmental impact Assessment] Methodology and Construction Environmental Management, Appendix 4.1 INS Scoping Opinion Comments, Appendix 4.2 Section 42 Consultation Comments 6.5 Air Quality, Appendix 5.1 Dust Risk Assessment 6.6 Cultural Heritage, Appendix 6.1 Desk Assessment, Appendix 6.2 Aerial Photograph Analysis at Paull, Appendix 6.3 Geophysical Survey Undertaken at Paull, Appendix 6.4 Geophysical Survey Undertaken at Goxhill, North Lincolnshire, Appendix 6.5 South End Bypass Geophysical Survey 6.7 Ecology and Nature Conservation, Appendix 7.1 Technical Appendix |