LevelItem
Finding NoDDX2195/2
Extent1 item
TitleRiver Humber Gas Pipeline Replacement Project: documents 6.1-6.7 binder
DateApr 2015
DescriptionIncludes Environmental Statement documents:
6.1 Introduction
6.2 Scheme Description
6.3 Design Iterations and Alternatives Considered, Appendix 3.3 Crossing Options Report
6.4 EIA [Environmental impact Assessment] Methodology and Construction Environmental Management, Appendix 4.1 INS Scoping Opinion Comments, Appendix 4.2 Section 42 Consultation Comments
6.5 Air Quality, Appendix 5.1 Dust Risk Assessment
6.6 Cultural Heritage, Appendix 6.1 Desk Assessment, Appendix 6.2 Aerial Photograph Analysis at Paull, Appendix 6.3 Geophysical Survey Undertaken at Paull, Appendix 6.4 Geophysical Survey Undertaken at Goxhill, North Lincolnshire, Appendix 6.5 South End Bypass Geophysical Survey
6.7 Ecology and Nature Conservation, Appendix 7.1 Technical Appendix
AccessStatusOpen
    Powered by CalmView© 2008-2025