Description | Includes: Skylight, carpenter's shed, 1 Jul 1878 Outside traveller for compartment boats, repair yard (details of Goliath for the compartment boats), 12 Feb 1879 Plan showing extensions of road for compartment Goliath, 8 Mar 1879 Portion of blacksmith shop repair yard, 5 Sep 1879 Traveller, 18 May 1880 5 ton frame crane repair yard, Jun 1880 Proposed extension of Dry Dock at Goole, repair yard, 18 Oct 1880 Stops for Dry Dock entrances, new repair yard Goole, 18 Oct 1880 New repair yard, proposed shed adjoining the saw mill, 1880 Plan of new fitting shop, Goole, 5 Feb 1881 Cross-section of column for the fitting shop, Goole repair yard, Apr 1881 Traveller for fitting shop, Goole, 9 May 1881 Fitting shop traveller, 22 Jun 1881 Bench in fitting shop repair yard, 1881 North elevation of present boiler shed, 14 Apr 1885 Plan of 5 ton crane, proposed to be fixed between boiler shop and fitting shop, 14 Dec 1881 Foundation for 1 1/2 cwt steam hammer, 18 Dec 1899 Repair yard sawmill, planing machine, lengthening, 28 May 1914 Plan of blacksmith shop on Jock [Hill], 29 Jun 1917 Compartment shop ventilators, 18 Feb 1918 Repair yard stores additional windows, 1919/1920
|