Description | Includes site plans, cross-sections and elevations:
Roof for shed, west side of Ouse Dock, 1 Feb 1881 Warehouse west side, 16 Aug 1883 'Victoria Lock' which includes Goole New Lock low gates, elevation of Low Pier south side of lock, 5 May 1887 Timber Jetty Murham Lane, 28 Sep 1887 Eastern Extension of Ouse Dock, 1888 Eastern Extension of Ouse Dock, 2 Jun 1888 Drawing showing suggestion for strengthening Victoria Pier, 1 Apr 1893 Goole Docks New Calais Berth, 9 Mar 1903 No 2 Graving Dock foundation for 7 ton Derrick crane, 1911 Indent south west corner Ouse Dock, 28 Apr 1914 New passageway, south of Lowther (Iron) Bridge connecting lines at north end of bridge, 14 Sep 1914
Three plans together: Wharf and roadway south west corner Railway Dock, 24 Nov 1917 Repair Dry Dock reconstruction, 5 Apr 1921 No 3 Dry Dock, 27 Oct 1922 Wharf on north east corner of ship dock plan, 27 Oct 1932
Undated: Let off culvert No 3 Dry Dock, nd. Eastern extension of Ouse Dock, nd. [fragile] Lowther Bridge, nd. [fragile] Eastern extension, nd. [fragile] Proposed extension of Banks Terrace siding, nd. No 1 Dry Dock, nd. |