Description | 'South Dock and Bridge 1' 'Dolphin', 30 Jul 1880 Piling at Illingworths Wharfe, 1 Dec 1887 Canal piling at alum works, Goole and Illingworth Wharfe, 25 Mar 1889 Canal piling alum works, 25 Mar 1892 Three suggestions for temporary bridges' supports, 11 Dec 1895 New Canal Bridge, Goole, 1898 Graving Dock alterations, pump house and sump, 22 Nov 1901 Graving Dock alterations, 27 Dec 1901 with accompanying letter from engineer's office to J G Bateman Canal widening, Goole and Knottingley Canal, 17 Oct 1905 Piling between steam packet [-] and repair yard, 1905 Proposed widening of canal at Goole to provide compartment boat siding, 27 Feb 1906 Piling south side of pipe subway, extension of piling from Box Dam for canal craft, 16 Aug 1907 Passageway, Bridge Street, 31 Aug 1907 Dockizing Canal, west side of Bridge Street, 16 Jun 1908 Passageway through Bridge Street, temporary fencing, 3 Jul 1909 [Fragile] Passageway through Bridge Street parapet walls and steps, 18 Sep 1909 Passageway through Bridge Street east end pier (includes drawing of pipe subway under canal at Goole, detail of concrete bottom), 9 Nov 1909 Passageway through Bridge Street east end pier, 3 Nov 1909 Passageway through Bridge Street west end pier, 30 Nov 1909 Dockizing Canal, west of Bridge Street, 1907-1910 Passageway through Bridge Street, roof of Pipe Bridge, 1909 Plan of dam around Pier Head at western end of passageway, 27 Nov 1909 No 2 Graving Dock, detail of piling at end, 13 Sep 1910 Renewal of pier at north side of South Dock, Goole, 20 Jun 1914 No 2 [Dry Dock], 23 Jun 1914 Temporary fence, No 2 Graving Dock, 5 Oct 1916 No 2 Dry Dock retaining wall, 30 Dec 1916
Undated: [?] Stones, lock Footbridge elevation [?] wall, North Swinefleet above Margery Clough Proposed drainage in connection with closing sewer at west end of Doyle Street Proposed stone yard at Goole Temporary bridge piles, new passage way Bridge Street Goole Canal temporary bridge Branch Dock near Repair Yard, petrol berth, nd |