Description | Deposited as BT 87, '8' Inner Barge Lock gates amended plan showing position of cloughs, 22 Jan 1878 Inner Barge lock, 28 May 1878 Inner barge lock entrance showing gates for 36 feet opening and 12 feet crop, Dec 1878 Inner barge lock details of foundation within the Cofferdam, Mar 1879 Inner barge lock entrance, 17 Mar 1879 Inner barge lock part of foundation plans showing planking of gate recess, 6 May 1879 Inner barge plan showing method of laying the floor of gate recess, Jul 1879 Plan showing position of staples, May 1879 South pier between ship lock and outer barge lock, 29 Mar 1892 'Expamet' concrete stanchion foundations at Goole, 1934 'Expamet' steel concrete roofing, lockgatemen's lobbies, Apr 1938
Undated: Section of old north wall at barge dock, nd. Inner barge lock casting, nd. |